Do you have any question about this error?
Message type: E = Error
Message class: EPRO - Messages for EDM Profile Processing
Message number: 392
Message text: The specified calculation interval is incomplete
You are performing a synchronous calculation. The last calculation
finished with errors. The calculation interval that you entered does
not cover the entire period of the interval(s) with errors.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
INCLUDE ISU_KORR OBJECT DOKU ID TX
Error message extract from SAP system. Copyright SAP SE.
EPRO392
- The specified calculation interval is incomplete ?The SAP error message EPRO392, which states "The specified calculation interval is incomplete," typically occurs in the context of SAP's Project System (PS) or other modules that involve planning and scheduling. This error indicates that the system has detected an issue with the time intervals defined for a calculation, such as a planning cycle or a project timeline.
Causes:
- Incomplete Time Intervals: The calculation interval defined for a project or planning cycle may not cover the entire period required for the calculation. This can happen if the start and end dates are not properly set.
- Missing Data: There may be missing data for certain periods within the defined interval, which prevents the system from performing the necessary calculations.
- Configuration Issues: Incorrect configuration settings in the project or planning parameters can lead to incomplete intervals.
- Data Consistency Issues: If there are inconsistencies in the data related to the project or planning objects, it can trigger this error.
Solutions:
- Check Calculation Intervals: Review the calculation intervals defined in the project or planning settings. Ensure that the start and end dates are correctly set and that they encompass the entire period needed for calculations.
- Complete Missing Data: Identify any missing data for the specified intervals and ensure that all necessary entries are filled in. This may involve checking for missing cost elements, activities, or other relevant data.
- Review Configuration Settings: Verify the configuration settings related to the project or planning cycle. Ensure that all necessary parameters are correctly defined and aligned with the business requirements.
- Data Consistency Check: Perform a data consistency check to identify any discrepancies or issues in the project data. Use transaction codes like
CJ20N
(Project Builder) orCJI3
(Project Actual Line Items) to review project data.- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the error message and the context in which it occurs.
Related Information:
CJ20N
, CJI3
, or CJI5
for project management and reporting.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
EPRO391
Enter a calculation interval or select a line
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EPRO390
You cannot select lines and enter a calculation period simultaneously
What causes this issue? You are performing a synchronous calculation. You have selected lines and entered a calculation period. However, you are not ...
EPRO393
The cal. interval does not agree with interval lngth &1 and day offset &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EPRO394
Formula allocation &1 uses &2 as an input profile
What causes this issue? You changed the <LS>No Calculation</> field. However, formula allocation &V1&, which is located one level...
Click on this link to search all SAP messages.