Do you have any question about this error?
Message type: E = Error
Message class: EL - IS-U meter reading data processing
Message number: 703
Message text: Scheduled meter reading date is before scheduled billing date
The scheduled meter reading date is after the scheduled billing date.
You have entered one of the following:
Negative interval of scheduled meter reading date: &V1&
Interval of scheduled billing date: &V2&
Postiive/negative indicator of scheduled billing date: &V3&
These entries are invalid because they can result in problems during
scheduling.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
INCLUDE ISU_KORR OBJECT DOKU ID TX
Error message extract from SAP system. Copyright SAP SE.
EL703
- Scheduled meter reading date is before scheduled billing date ?The SAP error message EL703, which states "Scheduled meter reading date is before scheduled billing date," typically occurs in the context of utility billing processes within SAP IS-U (Industry Solution for Utilities). This error indicates that the system has detected a scheduling conflict where the date for the meter reading is set to occur before the date for billing, which is not allowed.
Cause:
- Incorrect Scheduling: The meter reading date has been set earlier than the billing date in the system.
- Configuration Issues: There may be configuration settings in the billing or meter reading processes that do not align properly.
- Manual Entry Errors: Users may have manually entered dates incorrectly during the scheduling of meter readings or billing.
Solution:
To resolve the EL703 error, you can take the following steps:
Check Scheduled Dates:
- Review the scheduled meter reading date and the scheduled billing date in the relevant transaction (e.g., transaction code EL31 for meter reading).
- Ensure that the meter reading date is set to a date that is on or before the billing date.
Adjust Dates:
- If the meter reading date is indeed set before the billing date, adjust the meter reading date to a later date that is on or before the billing date.
- Alternatively, if the billing date is incorrect, adjust it to a date that is after the meter reading date.
Review Configuration:
- Check the configuration settings in the SAP system related to billing and meter reading. Ensure that the settings allow for proper scheduling of these processes.
- Consult with your SAP IS-U configuration team if necessary.
Reprocess the Transaction:
- After making the necessary adjustments, reprocess the transaction that generated the error to see if the issue is resolved.
Consult Documentation:
- Refer to SAP documentation or help notes related to the EL703 error for additional guidance and best practices.
Related Information:
By following these steps, you should be able to resolve the EL703 error and ensure that your meter reading and billing processes are correctly aligned.
Get instant SAP help. Start your 7-day free trial now.
EL702
Enter interval and pos./neg. indicator for date together
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EL701
No schedule records exist for reference &1 &2 in the specified period
What causes this issue? If you want to add a single &V1& during dynamic scheduling, schedule records must exist for a further &V1& w...
EL704
Select "Dynamic scheduling active" field in Customizing
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
EL705
No previous meter reading found for device &1, &2, MR date &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.