Do you have any question about this error?
Message type: E = Error
Message class: EL - IS-U meter reading data processing
Message number: 106
Message text: Dev. &1, MR date &2: Deviation fr. previous MR > perm. deviat. fixed val.
Validation 96 (automatic validation) recognized that the value exceeded
or fell below the permissible deviation. This check is only valid for
registers that relate to a nonactive or disconnected installation, or
for registers that are not yet allocated to an installation.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Devices with installation allocation:The meter reading can be released or reset for later processing.
Error message extract from SAP system. Copyright SAP SE.
EL106
- Dev. &1, MR date &2: Deviation fr. previous MR > perm. deviat. fixed val. ?The SAP error message EL106 indicates that there is a deviation in the material requirements (MR) date that exceeds the permitted deviation fixed value. This error typically occurs in the context of production planning or material management when the system detects that the planned dates for materials or production orders deviate from previously established parameters.
Cause:
- Deviation Exceeds Permitted Limits: The error arises when the new material requirement date (MR date) deviates from the previous MR date by more than the allowed limit set in the system.
- Configuration Settings: The fixed value for permitted deviation may be set too low in the configuration, leading to frequent errors when there are legitimate changes in the production schedule or material availability.
- Changes in Production Schedule: Changes in the production schedule, such as delays or rescheduling, can lead to deviations that exceed the allowed limits.
- Incorrect Data Entry: Manual entry errors or incorrect data in the material master or production order can also trigger this error.
Solution:
- Review Configuration Settings: Check the configuration settings for the permitted deviation fixed value in the relevant customizing settings (transaction code SPRO). Adjust the limits if necessary to accommodate realistic deviations.
- Analyze the MR Dates: Review the material requirement dates and the reasons for the deviation. Ensure that the changes are justified and necessary.
- Adjust Production Schedule: If the deviation is due to changes in the production schedule, consider adjusting the schedule to bring the MR dates within the permitted limits.
- Correct Data Entry: Verify and correct any data entry errors in the material master or production order that may have led to the deviation.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling this error in your version of SAP.
Related Information:
By following these steps, you should be able to identify the cause of the EL106 error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
EL105
Not all meter readings results have been entered
What causes this issue? You have not yet entered a meter reading for all meter reading documents. Gor the following transactions it is imperative tha...
EL104
Reassign not possible because target node is also selected node
What causes this issue? You have attempted to reassign a selected sub-tree to a node that belongs to that selected sub-tree. This is not possible.Sys...
EL107
Devices deleted implicitly from street route
What causes this issue? When calling up the transaction, the system noticed that there are devices in the street route, which are no longer allocated...
EL108
Devices deleted implicitly for street route of meter reading unit &1
What causes this issue? When the transaction "Maintain Street Route" is called, the system determines which devices no longer belong to the...
Click on this link to search all SAP messages.