Do you have any question about this error?
Message type: E = Error
Message class: EG - IS-U device management
Message number: 059
Message text: No renewal period could be determined for lot with S&1, B&2 and E&3
No renewal period could be found for the combination of division (&V1&)
certification requirement type (&V2&) and indicator for electronic
registers (&V3&).
Processing cannot be continued.
INCLUDE NA_SYSADMIN1 OBJECT DOKU ID TX
&sys_admin&
Specify a renewal period in Customizing for the above combination of
entries.
Error message extract from SAP system. Copyright SAP SE.
EG059
- No renewal period could be determined for lot with S&1, B&2 and E&3 ?The SAP error message EG059 indicates that the system is unable to determine a renewal period for a specific lot. This error typically arises in the context of materials management, particularly when dealing with lot management and batch management in SAP.
Cause:
The error message EG059 can be caused by several factors, including:
Missing or Incomplete Data: The lot in question may not have all the necessary data filled out, such as the expiration date, production date, or other relevant attributes that are required to calculate the renewal period.
Configuration Issues: There may be issues with the configuration settings in the system related to lot management or batch management. This could include settings for the material type, valuation class, or other related parameters.
Incorrect Lot Attributes: The attributes assigned to the lot may not align with the expected values for determining the renewal period. For example, if the lot is marked as non-renewable or has an invalid status.
Missing Master Data: The material master or batch master data may be incomplete or incorrectly configured, leading to the inability to determine the renewal period.
Solution:
To resolve the EG059 error, you can take the following steps:
Check Lot Data: Review the lot data for the specific lot (S&1, B&2, E&3) to ensure that all required fields are filled out correctly. Pay special attention to expiration dates, production dates, and any other relevant attributes.
Review Configuration Settings: Check the configuration settings for lot management and batch management in the SAP system. Ensure that all necessary settings are correctly configured to allow for the determination of renewal periods.
Validate Master Data: Ensure that the material master and batch master data are complete and accurate. This includes checking for any missing or incorrect information that could affect the renewal period calculation.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the EG059 error and its resolution. This may provide additional insights into the underlying cause and potential fixes.
Contact SAP Support: If the issue persists after checking the above items, consider reaching out to SAP support for further assistance. They may be able to provide more detailed troubleshooting steps or identify any system-specific issues.
Related Information:
By following these steps, you should be able to identify and resolve the cause of the EG059 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
EG057
Enter a valid lot type
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EG056
Device &1 has been changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EG060
Error occurred during determination of number of sample devices
What causes this issue? The number of sample devices and/or spare sample devices could not be determined for this lot.System Response The system iss...
EG061
Sample lot is changed in background
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.