How To Fix EEDMSET033 - PoD &1 is allocated to several grids in the settlement period


SAP Error Message - Details

  • Message type: E = Error

  • Message class: EEDMSET - Messages for Settlement

  • Message number: 033

  • Message text: PoD &1 is allocated to several grids in the settlement period

  • Show details Hide details
  • What causes this issue?

    Point of delivery &v1& is allocated to several grids for the settlement
    period &v2& to &v3&.
    The allocation of the point of delivery to a grid must not be changed
    during the settlement period.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message EEDMSET033 - PoD &1 is allocated to several grids in the settlement period ?

    The SAP error message EEDMSET033 indicates that a Point of Delivery (PoD) is allocated to multiple grids within the same settlement period. This situation typically arises in the context of energy management and settlement processes, where a PoD should ideally be linked to a single grid for accurate billing and reporting.

    Cause:

    1. Multiple Grid Allocations: The PoD has been assigned to more than one grid for the same settlement period, which is not allowed in the system.
    2. Data Entry Errors: Incorrect data entry during the configuration of the PoD or grid assignments.
    3. System Configuration Issues: Misconfiguration in the master data settings for the PoD or grid.
    4. Changes in Grid Assignments: Changes made to grid assignments without proper updates to the PoD configuration.

    Solution:

    1. Review PoD Assignments: Check the assignments of the PoD in the relevant configuration settings. Ensure that each PoD is only linked to one grid for the specified settlement period.
    2. Correct Data Entries: If there are errors in the data entries, correct them to ensure that the PoD is only associated with one grid.
    3. Update Master Data: If the PoD needs to be associated with a different grid, update the master data accordingly and ensure that the changes are reflected in the settlement period.
    4. Consult Documentation: Refer to SAP documentation or guidelines for managing PoD and grid assignments to ensure compliance with system requirements.
    5. Contact Support: If the issue persists, consider reaching out to SAP support or your internal IT team for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as EEDMSET for managing energy data management settings.
    • Master Data Management: Understand the importance of maintaining accurate master data for PoDs and grids to avoid similar issues in the future.
    • Settlement Periods: Be aware of how settlement periods are defined and managed within your SAP system, as this can impact the allocation of PoDs to grids.
    • Testing Changes: After making any changes, conduct thorough testing to ensure that the issue is resolved and that there are no further conflicts in the system.

    By addressing the root cause of the error and ensuring proper configuration and data management, you can resolve the EEDMSET033 error effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant