Do you have any question about this error?
Message type: E = Error
Message class: EE_QD -
Message number: 066
Message text: Quantity determination procedure changed from &1 to &2
You attempted to change the quantity determination procedure in the BAdI
implementation.
However, the quantity determination procedure &V1& must not be changed.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Change the BAdI implementation in BAdI ISU_QD_PROC.
Error message extract from SAP system. Copyright SAP SE.
EE_QD066
- Quantity determination procedure changed from &1 to &2 ?The SAP error message EE_QD066 indicates that there has been a change in the quantity determination procedure for a material or a document. This message typically arises in the context of materials management or production planning when the system detects that the quantity determination procedure has been altered from one value (&1) to another (&2).
Cause:
- Configuration Changes: The most common cause of this error is a change in the configuration settings for the quantity determination procedure in the system. This could be due to updates made by a user or an administrator.
- Master Data Changes: Changes in the material master data, such as the valuation class or the material type, can also lead to this error if they affect the quantity determination procedure.
- Document Changes: If a document (like a purchase order or production order) is being processed and the quantity determination procedure is modified during that process, it can trigger this error.
Solution:
- Review Configuration: Check the configuration settings for the quantity determination procedure in the relevant customizing settings (transaction code SPRO). Ensure that the settings are correct and consistent with the business requirements.
- Check Material Master Data: Review the material master data for the affected material. Ensure that the valuation class, material type, and other relevant fields are set correctly.
- Document Consistency: If the error occurs during document processing, ensure that the document is not being modified while it is being processed. If necessary, revert any recent changes that may have affected the document.
- Consult Change Logs: If you have access to change logs, review them to identify who made the changes and when. This can help in understanding the context of the change.
- Testing: After making any changes, perform testing to ensure that the error does not reoccur and that the quantity determination procedure works as expected.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in materials management or production planning.
Get instant SAP help. Start your 7-day free trial now.
EE_QD065
Entry will be deleted as quantity determination procedure not specified
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EE_QD064
Entry will be deleted as date not specfied
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
EE_QD067
Change is not within the billing-related installation
What causes this issue? You attempted to change the <LS>from-date</> or the <LS>to-date</> of the quantity determination proc...
EE_QD070
Meter readings exist on or after conversion date &3 for equip. &1 reg. &2
What causes this issue? You attempted to assign a new quantity determination procedure to register &V2&of equipment &V1&. However, th...
Click on this link to search all SAP messages.