How To Fix ECRM_ISU040 - Point of delivery is occupied by an incomplete contract from &2 to &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: ECRM_ISU - Messages for IS-U Contract

  • Message number: 040

  • Message text: Point of delivery is occupied by an incomplete contract from &2 to &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message ECRM_ISU040 - Point of delivery is occupied by an incomplete contract from &2 to &3 ?
    The SAP error message ECRM_ISU040 indicates that a point of delivery (POD) is occupied by an incomplete contract within a specified date range. This typically occurs in the context of SAP IS-U (Industry Solution for Utilities) when trying to perform actions related to contracts, such as creating a new contract or modifying an existing one.
    
    Cause: Incomplete Contract: The primary cause of this error is that there is an existing contract associated with the point of delivery that is not fully completed or is in a status that prevents further actions. Date Range: The error message specifies a date range (from &2 to &3) during which the contract is considered incomplete. This could be due to missing information, pending approvals, or other issues that prevent the contract from being finalized. Contract Status: The contract may be in a status such as "Pending," "In Process," or "Blocked," which does not allow for new contracts to

    Already have an account? Login here!


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker