How To Fix ECM_VAL402 - Context &: New validity is from & to &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: ECM_VAL - Engineering Change Management Validity

  • Message number: 402

  • Message text: Context &: New validity is from & to &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message ECM_VAL402 - Context &: New validity is from & to & ?
    The SAP error message ECM_VAL402 typically occurs in the context of managing validity periods for certain data records, such as master data or configuration settings. The message indicates that there is a conflict with the validity period you are trying to set for a particular record.
    
    Cause: The error message "ECM_VAL402 Context &: New validity is from & to &" suggests that the new validity period you are trying to assign overlaps with an existing validity period. This can happen in scenarios such as: Overlapping Validity Periods: You are trying to create or modify a record with a validity period that overlaps with an existing record. Incorrect Date Format: The dates provided may not be in the correct format or may not be recognized by the system. Data Integrity Rules: The system has built-in rules to prevent overlapping validity periods to maintain data integrity.
    Solution: To resolve this error, you can take the following steps: Check Existing Records:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant