Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix DRP_SC121 - Operation canceled


DRP_SC121 - Overview

  • Message type: E = Error

  • Message class: DRP_SC - DEV Reporting (SE28): Message Class for SE28 Tool

  • Message number: 121

  • Message text: Operation canceled

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


DRP_SC121 - Details

  • The SAP error message DRP_SC121, which states "Operation canceled," typically occurs in the context of supply chain planning or demand planning processes. This error can arise due to various reasons, and understanding the cause is essential for finding an appropriate solution.
    Causes:
    
    User Intervention: The operation may have been manually canceled by a user during execution.
    System Timeout: The process may have taken too long to execute, leading to a timeout and subsequent cancellation.
    Data Issues: There may be inconsistencies or issues with the data being processed, such as missing or incorrect master data.
    
    Configuration Issues: Incorrect configuration settings in the planning area or planning book can lead to this error. Locking Issues: If another process is locking the data that the current operation needs to access, it may result in a cancellation. Resource Constraints: Insufficient system resources (like memory or processing power) can lead to operation failures. Solutions: Check User Actions: Verify if the operation was canceled by

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


DRP_SC121 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker