Message type: E = Error
Message class: DPR_PROJECT - Development Projects: Messages for Projects
Message number: 037
Message text: Enter a valid unit for the distribution
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
DPR_PROJECT037
- Enter a valid unit for the distribution ?The SAP error message DPR_PROJECT037, which states "Enter a valid unit for the distribution," typically occurs in the context of project management within the SAP system, particularly when dealing with project definitions, distributions, or resource allocations.
Cause: This error usually arises due to one of the following reasons: Invalid Unit of Measure: The unit of measure (UoM) entered for a distribution is not recognized or is not valid for the context in which it is being used. This could happen if the UoM is misspelled, not defined in the system, or not applicable to the specific project or resource. Missing Configuration: The unit of measure may not be configured correctly in the system, or it may not be assigned to the relevant project or resource type. Data Entry Error: There may be a simple typographical error in the entry of the unit of measure.
Solution: To resolve the DPR_PROJECT037 error, you can take the following steps: Check the
Get instant SAP help. Sign up for our Free Essentials Plan.
DPR_PROJECT036
Enter a valid period type for the distribution
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_PROJECT035
'Period Type' or 'Distribution Unit' field was set
What causes this issue? At least one role exists in the project for whose role type the distribution of total demand is active (see Customizing for &...
DPR_PROJECT038
&1 is set as the default value for the project language
What causes this issue? You have selected more than one language as the default value for the project language. However, the system does not allow yo...
DPR_PROJECT039
&1 is set as the default value for the project language
What causes this issue? You have not selected a language as the default value for the project language.System Response The system selects &V1&am...
Click on this link to search all SAP messages.