Do you have any question about this error?
Message type: E = Error
Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages
Message number: 202
Message text: Import of the project structure from &1 unsuccessful
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
DPR_PROJ_INTEGRATION202
- Import of the project structure from &1 unsuccessful ?The SAP error message DPR_PROJ_INTEGRATION202, which indicates that the import of the project structure from a specified source was unsuccessful, typically arises in the context of SAP Project Management (PS) or SAP Portfolio and Project Management (PPM). Here are some common causes, potential solutions, and related information for this error:
Causes:
- Data Inconsistencies: There may be inconsistencies in the data being imported, such as missing mandatory fields or incorrect data formats.
- Authorization Issues: The user may not have the necessary authorizations to perform the import operation.
- Configuration Issues: The project structure or the integration settings may not be correctly configured.
- Technical Errors: There could be underlying technical issues, such as database connectivity problems or system performance issues.
- Dependencies Not Met: The project structure may depend on other objects or configurations that are not present or correctly set up in the target system.
Solutions:
- Check Data Validity: Review the data being imported for any inconsistencies or missing information. Ensure that all mandatory fields are filled out correctly.
- Review Authorizations: Verify that the user performing the import has the necessary authorizations to access and modify the project structure.
- Configuration Review: Check the configuration settings related to project integration. Ensure that all necessary settings are correctly defined.
- Error Logs: Look into the system logs (transaction SLG1) for more detailed error messages that can provide insights into what went wrong during the import process.
- Test Connectivity: Ensure that there are no connectivity issues between the systems involved in the import process.
- Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional troubleshooting steps or patches that may be required.
- Contact SAP Support: If the issue persists, consider reaching out to SAP support for assistance, providing them with detailed information about the error and the context in which it occurred.
Related Information:
DPR_PROJECT
, DPR_INTEGRATION
, or DPR_ADMIN
for managing project structures and integrations.By following these steps, you should be able to identify the root cause of the error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
DPR_PROJ_INTEGRATION201
No HTTP connection defined for object link type &1 to system &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_PROJ_INTEGRATION200
**** Project Management Interfacing Messages (200 -299) *******
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_PROJ_INTEGRATION203
Error while mapping Project Management data with Portf. Mgmt data
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_PROJ_INTEGRATION205
Data updated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.