Do you have any question about this error?
Message type: E = Error
Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages
Message number: 079
Message text: Project &1 will be changed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message DPR_PROJ_INTEGRATION079 typically occurs in the context of project management within the SAP system, particularly when dealing with project integration and changes to project definitions or structures. The message indicates that a project (identified by the project number &1) is going to be changed, which may be due to various reasons such as updates to project data, changes in project status, or modifications in project assignments.
Cause:
- Project Status Change: The project may be undergoing a status change that requires updates to its attributes or related data.
- Data Inconsistencies: There may be inconsistencies in the project data that need to be resolved before proceeding.
- Integration Issues: The project may be integrated with other modules (like Controlling, Finance, etc.), and changes in one module may necessitate updates in the project.
- User Permissions: The user may not have the necessary permissions to make changes to the project, leading to a warning or error message.
Solution:
- Review Project Data: Check the project data for any inconsistencies or required updates. Ensure that all necessary fields are filled out correctly.
- Check Project Status: Verify the current status of the project and determine if the intended changes are permissible based on that status.
- User Authorization: Ensure that the user has the appropriate permissions to make changes to the project. If not, contact your SAP administrator to obtain the necessary access.
- Integration Checks: If the project is integrated with other modules, ensure that all related data in those modules is consistent and up to date.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the error message and the context in which it appears.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic SAP error explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |
DPR_PROJ_INTEGRATION078 No mapping found for logical system &1, PS plant &2, location &3
Self-Explanatory Message Since SAP believes that this specific error message is ...
DPR_PROJ_INTEGRATION077 No mapping found for logical system &1, PS priority &2
Self-Explanatory Message Since SAP believes that this specific error message is ...
DPR_PROJ_INTEGRATION080 Project &1 changed
Self-Explanatory Message Since SAP believes that this specific error message is ...
DPR_PROJ_INTEGRATION081 Error while changing project &1
Self-Explanatory Message Since SAP believes that this specific error message is ...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.