Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: DG - DG: Messages for Dangerous Goods Management
Message number: 313
Message text: Change number is already released
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
DG313
- Change number is already released ?The SAP error message DG313, which states "Change number is already released," typically occurs in the context of change management within SAP, particularly when dealing with change numbers in the context of engineering change management (ECM) or similar processes.
Cause:
The error indicates that the change number you are trying to modify or release has already been released. In SAP, once a change number is released, it cannot be changed or modified further. This is a safeguard to ensure that changes are tracked and managed properly, preventing any unintended alterations to released change numbers.
Solution:
To resolve this error, consider the following steps:
Check the Status of the Change Number:
- Use transaction codes like
CC03
(Display Change Number) to view the status of the change number. Confirm that it is indeed released.Review Change Number Details:
- If you need to make modifications, you may need to create a new change number instead of trying to modify the existing one. This is a common practice in change management.
Unrelease the Change Number (if applicable):
- If your business process allows it and you have the necessary authorizations, you may be able to "unrelease" the change number. This can typically be done using transaction
CC02
(Change Change Number) if the system settings permit it. However, this is not always possible depending on the configuration and business rules.Consult Documentation or Support:
- If you are unsure about the process or need further assistance, consult your internal documentation or reach out to your SAP support team for guidance.
Create a New Change Number:
- If the change number is indeed released and cannot be modified, the best course of action is to create a new change number for any new changes you need to implement.
Related Information:
By following these steps, you should be able to address the DG313 error and continue with your change management activities in SAP.
Get instant SAP help. Sign up for our Free Essentials Plan.
DG312
*Authorization does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DG311
Change number &1 is already locked
What causes this issue? You want to create or process the change number &V1&. This means that one of the following situations led to an error...
DG314
Unknown error in engineering change management
What causes this issue? The function module called for engineering change management generated an exception.System Response The system issues an err...
DG320
No data records found with change number &1
What causes this issue? No data records could be found for the change number entered. Up to now, no data record was created or changed under this cha...
Click on this link to search all SAP messages.