Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 720
Message text: Order & operation &: Overlap conflict with successor &
An operation is to be dispatched in such a way that it overlaps with
thefollowing one. However no overlapping has been planned for the
operations.
Reschedule one of the operations that is causing the conflict or
reschedule another commitment so as to increase the available capacity.
Error message extract from SAP system. Copyright SAP SE.
CY720
- Order & operation &: Overlap conflict with successor & ?The SAP error message CY720 indicates an overlap conflict between operations in a production order. This typically occurs when the scheduling of operations in a routing overlaps in a way that is not allowed by the system's configuration or the defined production process. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
Overlapping Operations: The error arises when the start and finish times of one operation overlap with those of its successor operation. This can happen if:
- The duration of the predecessor operation is not sufficient to complete before the successor operation starts.
- The scheduling parameters (like lead times) are not set correctly.
- There are manual changes to the operation times that create conflicts.
Routing Configuration: The routing for the production order may not be configured to allow for overlapping operations, or the settings for the operations may not be compatible.
Capacity Constraints: If there are capacity constraints on the work center, it may not be possible to schedule operations as intended.
Solutions:
Check Operation Times: Review the start and finish times of the operations in the production order. Ensure that the predecessor operation finishes before the successor operation starts.
Adjust Scheduling Parameters: Modify the scheduling parameters in the routing or the production order to allow for proper sequencing of operations. This may include adjusting lead times or operation durations.
Review Routing Configuration: Ensure that the routing is correctly set up to allow for the intended sequence of operations. If necessary, modify the routing to eliminate conflicts.
Capacity Planning: Check the capacity of the work centers involved. If there are capacity constraints, consider adjusting the scheduling or adding additional resources.
Use Alternative Scheduling: If the operations must overlap for some reason, consider using alternative scheduling techniques, such as using parallel processing if the work center allows it.
Re-schedule the Order: If the above adjustments do not resolve the issue, you may need to re-schedule the entire production order to ensure that all operations are sequenced correctly.
Related Information:
By addressing the underlying causes of the overlap conflict, you should be able to resolve the CY720 error and successfully schedule your production operations.
Get instant SAP help. Start your 7-day free trial now.
CY719
Order & operation &: Overlap conflict with predecessor &
What causes this issue? An operation is to be dispatched in such a way that it overlaps with the preceding operation. However it was not intended tha...
CY718
Order & phase & was dispatched
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CY721
Order & operation & lies outside operation float
What causes this issue? An operation is to be dispatched so that it lies outside the operation float. However, in the strategy profile in Customizing...
CY722
Order & operation & lies outside float before prod. + operation float
What causes this issue? An operation is to be dispatched so that it lies outside the float before production and the operation float. However in the ...