Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 651
Message text: Drop graphical object: start & &, finish & &
By dragging and dropping a graphical object the start and finish points
in time were determined as given.
The system uses the points in time when carrying out the function, e.g.
the start point in time for the function "dispatch".
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CY651
- Drop graphical object: start & &, finish & & ?The SAP error message CY651 ("Drop graphical object: start & &, finish & &") typically occurs in the context of graphical planning tools, such as SAP APO (Advanced Planning and Optimization) or SAP PP (Production Planning). This error indicates that there is an issue with the graphical representation of a planning object, often related to the time intervals or the graphical elements being manipulated.
Causes:
- Invalid Time Intervals: The start and finish times specified for the graphical object may not be valid. This can happen if the start time is after the finish time or if the times fall outside the defined planning horizon.
- Data Integrity Issues: There may be inconsistencies in the underlying data that the graphical object is trying to represent, such as missing or incorrect data entries.
- Graphical Object Overlap: If the graphical object being manipulated overlaps with another object in a way that is not allowed, this error can occur.
- User Permissions: The user may not have the necessary permissions to modify the graphical object, leading to this error when attempting to drop or change it.
Solutions:
- Check Time Intervals: Verify the start and finish times of the graphical object. Ensure that the start time is before the finish time and that both times fall within the valid planning horizon.
- Review Data Integrity: Check the underlying data for any inconsistencies or missing entries. Ensure that all relevant data is correctly entered and up to date.
- Avoid Overlaps: If the graphical object overlaps with another, try adjusting the time intervals or moving the object to a different time slot where it does not conflict with others.
- User Permissions: Ensure that the user has the necessary permissions to modify the graphical object. If not, contact your system administrator to obtain the required access.
- System Logs: Check system logs for any additional error messages or warnings that may provide more context about the issue.
Related Information:
If the problem persists after trying the above solutions, consider reaching out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CY650
GANTT chart: function
What causes this issue? The Gantt chart has triggered the function "Continue". That means that the initialization is completed by means of ...
CY649
GANTT chart: menu function & triggered
What causes this issue? In the Gantt chart you have triggered a function from the menu or selected the corresponding pushbutton.System Response The ...
CY652
Drop graphical object: target chart/-line &/&, function &
What causes this issue? You have manipulated a graphical object using drag and drop and in this way triggered a function e.g. dispatching.System Resp...
CY653
Drag and drop graphical object: from & to & invalid
What causes this issue? You have taken a graphical object from a chart and moved it to another chart. No application function has been defined for th...