Do you have any question about this error?
Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 337
Message text: You must enter a valid scheduling level
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CY337
- You must enter a valid scheduling level ?The SAP error message CY337, "You must enter a valid scheduling level," typically occurs in the context of production planning and control, particularly when working with capacity planning or scheduling in SAP. This error indicates that the system requires a valid scheduling level to proceed with the operation you are attempting to perform.
Cause:
- Missing Scheduling Level: The scheduling level is not specified in the relevant transaction or configuration.
- Invalid Scheduling Level: The scheduling level entered does not match any of the predefined levels in the system.
- Configuration Issues: There may be issues with the configuration of the planning parameters in the system.
- User Input Error: The user may have entered an incorrect value or left the field blank.
Solution:
- Check Input Fields: Ensure that you have entered a valid scheduling level in the relevant field. The scheduling level should correspond to the levels defined in your system (e.g., plant, work center, production order).
- Review Configuration: Go to the configuration settings in SAP (transaction SPRO) and check the settings for scheduling levels under the relevant modules (like Production Planning or Capacity Planning). Ensure that the scheduling levels are correctly defined.
- Consult Documentation: Refer to SAP documentation or help files to understand the valid values for scheduling levels in your specific context.
- User Training: If the error is due to user input, consider providing training or guidelines to users on how to correctly enter scheduling levels.
- Check Authorizations: Ensure that the user has the necessary authorizations to access and modify scheduling levels.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance.
Get instant SAP help. Start your 7-day free trial now.
CY336
The time profile & could not be read
What causes this issue? The system could not read the time profile &V1&. This can happen if the time profile no longer exists because it was ...
CY335
The strategy profile & could not be read
What causes this issue? The system could not read the strategy profile &V1&. This can happen if the strategy profile no longer exists because...
CY338
The operation & in order & has already been dispatched
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CY339
Start date in the past
What causes this issue? You are trying to dispatch the operation &V3& for the order &V2& with the order type &V1& to a partic...
Click on this link to search all SAP messages.