Do you have any question about this error?
Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 314
Message text: Error in calculating date for dispatching backlog
The system cannot convert your entries for the date for dispatching the
backlog (entry type and date) into a concrete date.
You should contact your system administrator.
Error message extract from SAP system. Copyright SAP SE.
CY314
- Error in calculating date for dispatching backlog ?The SAP error message CY314, which states "Error in calculating date for dispatching backlog," typically occurs in the context of production planning and scheduling. This error indicates that there is an issue with the system's ability to calculate the dates for dispatching materials or production orders due to various reasons.
Causes of CY314 Error
Missing or Incorrect Master Data: The error may arise from missing or incorrect master data such as material master records, routing, or work center data. If the system cannot find the necessary information to calculate dates, it will trigger this error.
Capacity Constraints: If there are capacity constraints in the work centers or if the production resources are not available, the system may fail to calculate the dispatch dates.
Scheduling Parameters: Incorrect scheduling parameters or settings in the production planning configuration can lead to this error. This includes lead times, processing times, or any other relevant scheduling data.
Calendar Issues: If the factory calendar or holiday calendar is not set up correctly, it can affect the scheduling and lead to errors in date calculations.
Order Status: If the production order or related documents are in a status that does not allow for scheduling (e.g., if they are already completed or canceled), this can also trigger the error.
Solutions to CY314 Error
Check Master Data: Review the relevant master data for the materials, routing, and work centers involved. Ensure that all necessary information is complete and accurate.
Review Capacity Planning: Check the capacity of the work centers and ensure that there are no constraints that would prevent scheduling. Adjust capacity or reschedule orders as necessary.
Adjust Scheduling Parameters: Review and adjust the scheduling parameters in the production planning configuration. Ensure that lead times and processing times are set correctly.
Verify Calendar Settings: Check the factory calendar and holiday calendar settings to ensure they are configured correctly. Make sure that the system recognizes working days and non-working days appropriately.
Check Order Status: Verify the status of the production orders and related documents. If they are in a status that does not allow for scheduling, take appropriate action to change their status if necessary.
Run Scheduling Again: After making the necessary adjustments, try to run the scheduling process again to see if the error persists.
Related Information
Transaction Codes: You may need to use transaction codes such as CO02 (Change Production Order), CO03 (Display Production Order), or MD04 (Stock/Requirements List) to investigate the issue further.
SAP Notes: Check for any relevant SAP Notes or Knowledge Base Articles that may address this specific error or provide additional troubleshooting steps.
Consult Documentation: Review SAP documentation related to production planning and scheduling for best practices and configuration guidelines.
If the error persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
CY313
Error in calculating period
What causes this issue? The system cannot convert your entries for the period (entry type, start date and end date) to a concrete time interval.How t...
CY312
The object set and filter set must be different.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CY315
The date for dispatching the backlog is outside the d.base reading period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CY316
The evaluation period is not within the database reading period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.