Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CY262
- Fully define a routing ?The SAP error message CY262: Fully define a routing typically occurs when you are trying to create or modify a routing in the SAP system, but the routing is not fully defined. This means that certain required fields or components of the routing are missing or incomplete.
Cause:
The error can be triggered by several factors, including:
- Missing Operations: The routing may not have all the necessary operations defined.
- Incomplete Work Center Assignment: Each operation in the routing must be assigned to a valid work center.
- Missing Control Keys: Control keys that define how the operation should be processed may be missing.
- Incomplete Sequence: The sequence of operations may not be properly defined.
- Missing Standard Values: Standard values for processing times, setup times, etc., may not be entered.
Solution:
To resolve the CY262 error, you can take the following steps:
Check Routing Details:
- Go to the routing transaction (e.g., CA01 for creating or CA02 for changing).
- Ensure that all required fields are filled in for each operation.
Verify Operations:
- Make sure that each operation has a valid work center assigned.
- Check that all necessary operations are included in the routing.
Control Keys:
- Ensure that each operation has a control key assigned that is appropriate for the type of operation being performed.
Standard Values:
- Enter any missing standard values for processing times, setup times, etc.
Sequence of Operations:
- Ensure that the sequence of operations is logical and complete.
Save Changes:
- After making the necessary adjustments, save the routing and check if the error persists.
Related Information:
Transaction Codes:
Routing Components:
Documentation:
By ensuring that all required fields and components are properly defined, you should be able to resolve the CY262 error and successfully create or modify the routing in SAP.
Get instant SAP help. Start your 7-day free trial now.
CY261
Either enter a material or a routing
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CY260
No orders are assigned to the WBS element, so no processing occurs
What causes this issue? No orders have been assigned to the WBS element. For this reason processing was terminated. The system issues an error messag...
CY263
Enter either a material, a routing or a sales order
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CY280
No actual capacity requirements were found in the evaluation period
What causes this issue? No actual capacity requirements were found for the orders selected in the evaluation period.How to fix this error? Check the...
Click on this link to search all SAP messages.