Do you have any question about this error?
Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 116
Message text: You cannot use the period type "factory calendar day"
You want to select the period type "factory calendar days". You cannot
display the periods in factory calendar days however, because not all
of the selected capacities have been allocated the same factory
calendar.
Please select another period type.
Error message extract from SAP system. Copyright SAP SE.
CY116
- You cannot use the period type "factory calendar day" ?The SAP error message CY116, which states "You cannot use the period type 'factory calendar day'," typically occurs in the context of planning and scheduling within SAP, particularly when dealing with production planning or capacity planning.
Cause:
The error is usually triggered when a user attempts to use a period type that is not compatible with the settings or configurations in the system. Specifically, the "factory calendar day" period type may not be allowed in certain contexts, such as when the system expects a different type of period (e.g., working days, calendar days, etc.) for planning purposes.
Solution:
To resolve this error, you can consider the following steps:
Check Configuration Settings:
- Go to the configuration settings for the planning area or the specific planning process you are working with. Ensure that the period types being used are correctly defined and compatible with the planning scenario.
Change Period Type:
- If the "factory calendar day" is not suitable for your planning scenario, consider changing the period type to one that is allowed. This can often be done in the planning transaction or configuration settings.
Review Factory Calendar Settings:
- Ensure that the factory calendar is correctly set up in the system. Check if the factory calendar is active and properly defined for the relevant planning areas.
Consult Documentation:
- Review SAP documentation or help resources related to the specific planning module you are using. This can provide insights into the allowed period types and their configurations.
User Authorization:
- Ensure that you have the necessary authorizations to make changes to the planning settings. Sometimes, restrictions in user roles can lead to such errors.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. They can provide more detailed insights based on your specific system configuration.
Related Information:
SPRO
(for configuration), MD01
(for planning), and others that may be relevant to your planning processes.By following these steps, you should be able to identify the root cause of the error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
CY115
Please assign a valid overall profile to the parameter &
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
CY114
The std. profile & was not found when the transaction was started
What causes this issue? Internal error. The overall profile with which the transaction is started is not contained in the table of overall profiles....
CY117
You cannot use the period type "posting period"
What causes this issue? This period type is not permitted, since not all selected capacities belong to company codes using the same fiscal year varia...
CY118
You cannot enter factory calendar days or posting periods
What causes this issue? You want to enter the period type "factory calendar day" or "posting period". The time period can only be...
Click on this link to search all SAP messages.