How To Fix CY098 - Operation & & was changed


CY098 - Overview

  • Message type: E = Error

  • Message class: CY - Capacity Requirements Planning

  • Message number: 098

  • Message text: Operation & & was changed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CY098 - Operation & & was changed ?
    The SAP error message CY098 typically indicates that an operation in a production order or a routing has been changed. This can occur in various scenarios, such as when there are updates to the operation details, changes in the sequence, or modifications to the work center or other parameters associated with the operation.
    
    Cause: Manual Changes: A user may have manually changed the operation details in the routing or production order. System Updates: Changes made by the system due to configuration updates or batch jobs that modify operations. Data Consistency Issues: Inconsistencies in the data between the routing and the production order can trigger this error. Versioning: If the operation has been changed in a different version of the routing, it may lead to this error when trying to process the order.
    Solution: Review Changes: Check the change logs for the routing or production order to identify what changes were made to the operation. Revalidate the Order: If

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant