Do you have any question about this error?
Message type: E = Error
Message class: CRD_RUN - General Messages for CRD Runtime
Message number: 001
Message text: Check of requirements
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CRD_RUN001
- Check of requirements ?The SAP error message CRD_RUN001, which indicates a "Check of requirements" issue, typically arises during the planning or execution of a process in SAP, such as production planning or material requirements planning (MRP). This error usually signifies that there is a problem with the requirements check for a specific material or production order.
Causes:
- Missing Master Data: The material master data or BOM (Bill of Materials) may be incomplete or missing.
- Incorrect Configuration: The configuration settings for MRP or production planning may not be set up correctly.
- Stock Issues: There may be insufficient stock or incorrect stock levels for the materials involved.
- Planning Parameters: Incorrect planning parameters or settings in the MRP run can lead to this error.
- Dependencies: There may be dependencies or constraints that are not being met, such as lead times or capacity issues.
Solutions:
- Check Master Data: Ensure that the material master data, BOM, and routing are correctly set up and complete.
- Review MRP Settings: Verify the MRP settings and parameters to ensure they are configured correctly for the planning run.
- Stock Verification: Check the stock levels of the materials involved to ensure that there is enough inventory to meet the requirements.
- Analyze Planning Run Logs: Review the logs generated during the MRP run to identify specific issues or warnings that may provide more context on the error.
- Adjust Planning Parameters: If necessary, adjust the planning parameters to better align with the production and inventory needs.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the error message and its context.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CRD_REQBUILD506
Cannot determine read object for assignments
What causes this issue? To generate a read object for assignments of <DS:GLOS.44B0EE2DD54B5062E10000000A1553FE>credential descriptions</>...
CRD_REQBUILD505
More than one implementation of BAdI CRD_SIMPLERQMNT was found
What causes this issue? For requirement &v1& , several enhancements to the BAdI <ZK>Enhancement of Simple Requirement</> (CRD_SIM...
CRD_RUN002
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CRD_RUN003
Application &1 is not a credentialing application
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.