How To Fix CR411 - Work center & plant & is still being used in a hierarchy and group


CR411 - Overview

  • Message type: E = Error

  • Message class: CR - (1,099) Work Center; (100,200) Capacity

  • Message number: 411

  • Message text: Work center & plant & is still being used in a hierarchy and group

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CR411 - Work center & plant & is still being used in a hierarchy and group ?
    The SAP error message CR411 indicates that a work center is still being used in a hierarchy or group, which prevents certain operations from being performed, such as deleting or changing the work center. This is a common issue in SAP when trying to modify or delete work centers that are linked to other objects in the system.
    
    Cause: Hierarchy Usage: The work center is part of a hierarchy, meaning it is linked to other work centers in a parent-child relationship. Group Assignment: The work center is assigned to a group, which may be used in production planning or other processes. Active Assignments: The work center may be actively assigned to production orders, routing, or other master data that prevents its modification.
    Solution: To resolve the CR411 error, you can follow these steps: Check Hierarchy: Use transaction code CR03 (Display Work Center) to check if the work center is part of a hierarchy. If it is, you will need

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker