How To Fix CR254 - Resource & plant & not assigned to hierarchy & plant &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CR - (1,099) Work Center; (100,200) Capacity

  • Message number: 254

  • Message text: Resource & plant & not assigned to hierarchy & plant &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CR254 - Resource & plant & not assigned to hierarchy & plant & ?

    The SAP error message CR254 indicates that a specific resource and plant combination is not assigned to the relevant hierarchy in the system. This typically occurs in the context of capacity planning or production planning when the system is trying to access or utilize a resource that has not been properly configured in the hierarchy.

    Cause:

    1. Missing Assignment: The resource (e.g., machine, labor) is not assigned to the plant in the capacity planning hierarchy.
    2. Configuration Issues: There may be issues in the configuration of the resource or plant in the SAP system.
    3. Data Inconsistencies: There could be inconsistencies in the master data related to the resource or plant.
    4. Hierarchy Structure: The hierarchy structure may not be properly set up or may have been changed without updating the assignments.

    Solution:

    1. Check Resource Assignment:

      • Go to the transaction code CR01 (Create Work Center) or CR02 (Change Work Center) and verify if the resource is assigned to the correct plant.
      • Ensure that the resource is included in the appropriate hierarchy.
    2. Assign Resource to Plant:

      • If the resource is not assigned, you can assign it to the plant using the same transaction codes mentioned above.
      • Make sure to save the changes after making the assignment.
    3. Review Hierarchy Configuration:

      • Check the configuration of the hierarchy in the system. You may need to use transaction codes like CR03 (Display Work Center) to review the hierarchy settings.
      • Ensure that the hierarchy is correctly structured and that all necessary resources are included.
    4. Check Master Data:

      • Review the master data for both the resource and the plant to ensure that there are no discrepancies.
      • Use transaction codes like C223 (Change Resource) to check the details.
    5. Consult Documentation:

      • Refer to SAP documentation or help files for additional guidance on setting up resources and plants in the hierarchy.
    6. Contact Support:

      • If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CR01, CR02, CR03, and C223 for managing work centers and resources.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Roles: Ensure that you have the necessary permissions to make changes to resource and plant assignments in the system.

    By following these steps, you should be able to resolve the CR254 error and ensure that your resources are correctly assigned to the appropriate plants in the hierarchy.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1