Message type: E = Error
Message class: CR - (1,099) Work Center; (100,200) Capacity
Message number: 162
Message text: A capacity utilization rate cannot exceed 400% for tech. reasons
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CR162
- A capacity utilization rate cannot exceed 400% for tech. reasons ?The SAP error message CR162 indicates that the capacity utilization rate for a particular resource or work center has exceeded the maximum limit of 400%. This error typically arises in the context of production planning and scheduling when the system calculates the capacity utilization based on the planned orders, production orders, or other related activities.
Cause: Excessive Load: The planned production or orders assigned to a work center exceed its available capacity. This can happen if: There are too many orders scheduled for the same time period. The duration of the operations is underestimated. The work center is not properly defined with its available capacity. Incorrect Configuration: The configuration of the work center or routing may not accurately reflect the actual capacity or capabilities of the resource. Data Entry Errors: Incorrect data entry in production orders, planned orders, or work center settings can lead to unrealistic capacity utilization calculations.
Solution: Review Capacity Planning: Check the capacity planning settings for the
Get instant SAP help. Sign up for our Free Essentials Plan.
CR161
Value of capacity in unit & is too large to be displayed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CR160
Shift sequence: Unnecessary entries are ignored
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CR163
Default values cannot be maintained for intervals
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CR164
Work center & in plant & has not yet been classified
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.