Do you have any question about this error?
Message type: E = Error
Message class: CR - (1,099) Work Center; (100,200) Capacity
Message number: 118
Message text: Capacity & plant & category & is a pooled capacity
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CR118
- Capacity & plant & category & is a pooled capacity ?The SAP error message CR118 indicates that the capacity you are trying to use is a pooled capacity, which means it is not assigned to a specific work center or production line but is instead shared among multiple work centers or production lines. This can lead to issues when trying to allocate or schedule production activities.
Cause:
- Pooled Capacity: The capacity you are trying to use is defined as a pooled capacity in the system. Pooled capacities are typically used for resources that can be shared across multiple production areas.
- Incorrect Assignment: The work center or production line you are trying to schedule may not be correctly assigned to the pooled capacity.
- Configuration Issues: There may be configuration issues in the capacity planning settings that need to be addressed.
Solution:
Check Capacity Configuration:
- Go to the capacity planning settings in SAP and verify the configuration of the pooled capacity. Ensure that it is set up correctly and that the relevant work centers are assigned to it.
Assign Work Centers:
- If you need to use a specific work center, ensure that it is not set as a pooled capacity. You may need to create a dedicated capacity for that work center if it should not share resources.
Review Production Planning:
- Check the production planning settings to ensure that the correct capacities are being used for scheduling. You may need to adjust the planning parameters to avoid using pooled capacities when not appropriate.
Consult Documentation:
- Refer to SAP documentation or help resources for more detailed information on managing capacities and resolving related issues.
Contact SAP Support:
- If the issue persists, consider reaching out to SAP support or your internal SAP team for further assistance. They can provide insights based on your specific configuration and usage.
Related Information:
By addressing the configuration and assignment of capacities, you should be able to resolve the CR118 error and proceed with your production planning activities.
Get instant SAP help. Start your 7-day free trial now.
CR117
Work center & in plant & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CR116
Shift & not set up for grouping &
What causes this issue? You entered a shift sequence or shift definition which is not in the active group or is not valid during the period you enter...
CR119
Capacity & plant & category & has a ref. available capacity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CR120
Capacity is still being used
What causes this issue? You are trying to delete a capacity that is still being used.How to fix this error? If the capacity is <ZH>not a work ...
Click on this link to search all SAP messages.