Do you have any question about this error?
Message type: E = Error
Message class: CR - (1,099) Work Center; (100,200) Capacity
Message number: 021
Message text: A standard value key is required for use in task lists
When you defined the usage, you specified in which task lists you may
use the work center. If you enter a usage, you must also maintain the
standard value key.
Error message extract from SAP system. Copyright SAP SE.
CR021
- A standard value key is required for use in task lists ?The SAP error message CR021, which states "A standard value key is required for use in task lists," typically occurs in the context of production planning and control, particularly when working with task lists in the SAP system. This error indicates that a standard value key, which is necessary for defining the standard times for operations in a task list, is missing or not properly assigned.
Cause:
- Missing Standard Value Key: The most common cause of this error is that the task list (such as a routing or a production order) does not have a standard value key assigned to its operations.
- Incorrect Configuration: The standard value key may not be configured correctly in the system, or it may not exist in the database.
- Task List Type: The type of task list being used may require a standard value key that has not been defined.
Solution:
Assign a Standard Value Key:
- Go to the task list (routing or production order) in question.
- Check the operations within the task list and ensure that each operation has a standard value key assigned.
- If it is missing, you can assign a standard value key that is appropriate for the operation.
Create or Modify Standard Value Keys:
- If the required standard value key does not exist, you may need to create it.
- Navigate to the configuration settings for standard value keys in SAP (Transaction code: OPL8 for routing or OPL9 for work centers).
- Define the standard value key with the necessary parameters.
Check Configuration Settings:
- Ensure that the configuration settings for task lists and standard values are correctly set up in the system.
- You may need to consult with your SAP configuration team or refer to SAP documentation for specific settings.
Review Task List Type:
- Ensure that the task list type you are using is compatible with the standard value key requirements.
Related Information:
Transaction Codes:
Documentation:
SAP Notes:
User Roles:
By following these steps, you should be able to resolve the CR021 error and ensure that your task lists are properly configured with the necessary standard value keys.
Get instant SAP help. Start your 7-day free trial now.
CR020
There is still no data for this screen
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CR019
Cost center & not set up in controlling area & on &
What causes this issue? You are attempting to assign a work center to a cost center that has not been set up in controlling area &V2&.How to ...
CR022
The work center is already being used, update task lists
What causes this issue? You want to change the standard value key for a work center. However, this work center is already used in task lists, which m...
CR023
Not all screens were displayed from the object to be copied
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.