Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 808
Message text: The configurable material & plant & was not taken into account
You want to schedule routings and then copy the resulting internal
processing times into the material master. However, material &V1& in
plant &V2& is configurable. You assign so-called "super" routings to
configurable materials. In scheduling these super-routings do not
produce realistic internal processing times.
Do not update the material masters of configurable naterials using
scheduling.
Error message extract from SAP system. Copyright SAP SE.
CP808
- The configurable material & plant & was not taken into account ?The SAP error message CP808 indicates that a configurable material in a specific plant was not taken into account during a configuration or planning process. This error typically arises in the context of variant configuration, where specific configurations of a product are managed.
Cause:
- Missing Configuration: The configurable material may not have been properly configured or may lack the necessary characteristics and values.
- Plant-Specific Settings: The material may not be set up correctly for the specific plant in question, leading to it being excluded from planning or configuration.
- Master Data Issues: There may be issues with the master data, such as missing or incorrect entries in the material master or BOM (Bill of Materials).
- Planning Parameters: The planning parameters for the material may not be set correctly, preventing it from being considered in the planning run.
- Status of the Material: The material might be in a status that prevents it from being used in planning (e.g., blocked or inactive).
Solution:
- Check Configuration: Ensure that the configurable material is correctly configured with all necessary characteristics and values. Use transaction code CU50 to check the configuration.
- Review Material Master: Verify the material master data for the configurable material in the specific plant. Ensure that all relevant fields are filled out correctly.
- Check BOM and Routing: Ensure that the BOM and routing for the configurable material are correctly defined and assigned to the plant.
- Validate Plant Settings: Check the plant-specific settings for the material to ensure it is active and available for planning.
- Review Planning Parameters: Check the planning parameters and ensure that the material is included in the planning run.
- Check Status: Ensure that the material is not blocked or inactive in the system.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or refer to SAP community forums for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CP807
Select "Update material master directly"
What causes this issue? You want to update the material master record with the scheduling results from the routing and copy the assembly scrap determ...
CP806
Material &1 plant &2: Interop. time cannot be converted to base unit
What causes this issue? You want to update the scheduling data for material &V1& in plant &V2&. However, this is not possible for int...
CP810
You do not have an authorization for plant &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP811
No authorization for planner group &.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.