Do you have any question about this error?
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 666
Message text: &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CP666
- & ?The SAP error message CP666 typically relates to issues in the context of production planning and control, particularly when dealing with capacity planning or production orders. The specific message may vary based on the configuration and context in which it appears, but it generally indicates a problem with capacity evaluation or planning.
Cause:
- Capacity Overload: The error may occur if there is an overload of capacity in a work center, meaning that the planned production exceeds the available capacity.
- Incorrect Configuration: There may be issues with the configuration of work centers, routing, or production versions.
- Missing Master Data: Required master data such as work centers, production resources/tools, or production versions may be missing or incorrectly set up.
- Scheduling Conflicts: Conflicts in scheduling due to overlapping production orders or maintenance activities can also trigger this error.
Solution:
- Check Capacity: Review the capacity of the work center in question. Ensure that the available capacity is sufficient for the planned production.
- Adjust Production Orders: If there is an overload, consider adjusting the production orders, either by rescheduling or reducing the quantities.
- Review Master Data: Ensure that all necessary master data is correctly configured and available. This includes checking work centers, routing, and production versions.
- Analyze Scheduling: Look for any scheduling conflicts that may be causing the issue. Adjust the scheduling of production orders as necessary.
- Use Capacity Planning Tools: Utilize SAP's capacity planning tools to analyze and optimize capacity utilization.
Related Information:
CM01
(Capacity Overview) or CM21
(Capacity Planning) to analyze capacity issues.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or refer to SAP community forums for more specific advice related to your system configuration.
Get instant SAP help. Start your 7-day free trial now.
CRM_MKTPL_ENR027
Target Group contains &1 or more BPs, use Add By TG (Background)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CRM_MKTPL_ENR025
Error while deleting member(s)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP672
Select task list first
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP673
Select operation first
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.