How To Fix CP502 - Enter a minimum overlap time


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CP - Task list messages: Core data

  • Message number: 502

  • Message text: Enter a minimum overlap time

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CP502 - Enter a minimum overlap time ?

    The SAP error message CP502, which states "Enter a minimum overlap time," typically occurs in the context of production planning and scheduling within the SAP system. This error is related to the scheduling of operations in a production order or a process order, where the system requires a minimum overlap time between operations to ensure that resources are utilized efficiently and that there are no gaps in production.

    Cause:

    The error is triggered when:

    1. Overlap Time Not Defined: The minimum overlap time required for the operations is not defined in the system.
    2. Scheduling Parameters: The scheduling parameters for the production order or operation do not meet the required overlap time.
    3. Resource Constraints: There may be constraints related to the resources (like machines or labor) that prevent the operations from being scheduled with the required overlap.

    Solution:

    To resolve the CP502 error, you can take the following steps:

    1. Check Overlap Time Settings:

      • Go to the relevant configuration settings in SAP (usually in the production planning module) and check the minimum overlap time settings for the operations involved.
      • Ensure that the overlap time is defined and meets the requirements of the operations being scheduled.
    2. Adjust Scheduling Parameters:

      • Review the scheduling parameters for the production order or operation. You may need to adjust the start and finish times of the operations to allow for the required overlap.
      • You can do this in the production order or process order by navigating to the scheduling tab and adjusting the times accordingly.
    3. Resource Availability:

      • Check the availability of resources (machines, labor) to ensure that they can accommodate the required overlap time.
      • If necessary, adjust the resource assignments or availability to allow for the overlap.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for specific details on how to configure overlap times and scheduling parameters.
    5. Testing:

      • After making the necessary adjustments, try to reschedule the operations to see if the error persists.

    Related Information:

    • Transaction Codes: You may use transaction codes like CO02 (Change Production Order) or CO01 (Create Production Order) to access and modify production orders.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Exits and BAdIs: If your organization has custom developments, check if there are any user exits or BAdIs that might affect scheduling behavior.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker