How To Fix CP492 - Work center for cumulation function & is invalid


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CP - Task list messages: Core data

  • Message number: 492

  • Message text: Work center for cumulation function & is invalid

  • Show details Hide details
  • What causes this issue?

    The work center that you have entered in the routing of the cumulation
    function, either does not exist or cannot be used in this type of
    routing.

    System Response

    The standard value cumulation is interrupted.

    How to fix this error?

    Enter in the routing a work center that exists and can be used in the
    routing.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CP492 - Work center for cumulation function & is invalid ?

    The SAP error message CP492 indicates that there is an issue with the work center associated with a cumulation function in the system. This error typically arises in the context of production planning and control, particularly when dealing with capacity planning and work center assignments.

    Cause:

    1. Invalid Work Center: The work center specified in the operation or routing may not exist or may have been deleted.
    2. Incorrect Configuration: The work center may not be properly configured for the cumulation function you are trying to use.
    3. Inactive Work Center: The work center might be inactive or not available for the period you are trying to use it.
    4. Missing Master Data: There may be missing or incomplete master data related to the work center, such as capacity data or valid periods.

    Solution:

    1. Check Work Center: Verify that the work center exists in the system. You can do this by navigating to the work center transaction (e.g., CR01 or CR02) and checking if the work center is active and correctly configured.
    2. Review Configuration: Ensure that the work center is set up correctly for the cumulation function you are trying to use. This includes checking the settings related to capacity planning and production scheduling.
    3. Activate Work Center: If the work center is inactive, you may need to activate it or ensure that it is available for the relevant time period.
    4. Update Master Data: If there are missing or incomplete data entries, update the work center master data to include all necessary information, such as valid capacity and scheduling details.
    5. Check Authorization: Ensure that you have the necessary authorizations to access and modify the work center settings.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CR01 (Create Work Center), CR02 (Change Work Center), and CR03 (Display Work Center).
    • Documentation: Refer to SAP documentation or help files for detailed information on work center configuration and cumulation functions.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
    • Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    By following these steps, you should be able to identify and resolve the issue causing the CP492 error message in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author