Do you have any question about this error?
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 456
Message text: Enter a unit for dimension & for the standard value &.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CP456
- Enter a unit for dimension & for the standard value &. ?The SAP error message CP456 ("Enter a unit for dimension & for the standard value &.") typically occurs in the context of production planning or when working with standard values in routing or work centers. This error indicates that a required unit of measure for a specific dimension (like time, length, weight, etc.) has not been entered for a standard value.
Cause:
- Missing Unit of Measure: The most common cause is that the unit of measure for a standard value (like setup time, processing time, etc.) has not been specified in the relevant configuration.
- Incorrect Configuration: The configuration of the routing or work center may be incomplete or incorrect, leading to missing data.
- Data Entry Error: During data entry, the user may have overlooked entering the unit of measure for a specific dimension.
Solution:
Check Routing/Work Center:
- Navigate to the routing or work center where the error occurred.
- Ensure that all standard values have an associated unit of measure. This can typically be done in transaction codes like
CA01
(Create Routing) orCR01
(Create Work Center).Enter Missing Units:
- If you find that a unit of measure is missing, enter the appropriate unit for the dimension indicated in the error message.
- Make sure that the unit of measure is valid and corresponds to the standard value being entered.
Review Configuration:
- If the error persists, review the configuration settings for the relevant production planning module to ensure that all necessary fields are correctly set up.
Consult Documentation:
- Refer to SAP documentation or help files for specific guidance on the standard values and units of measure relevant to your business processes.
Testing:
- After making the necessary changes, test the process again to ensure that the error has been resolved.
Related Information:
CA01
, CA02
, CR01
, and CR02
for routing and work center management.If the problem continues after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.
Get instant SAP help. Start your 7-day free trial now.
CP455
Enter a unit for standard value &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP454
Enter standard value &
What causes this issue? The rule in the work center specifies that the standard value &V1& should or must be entered.How to fix this error? ...
CP457
Maintain a cost ctr. for the activity types specified in the work ctr. &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP458
You cannot enter an activity type for standard value &
What causes this issue? You are attempting to enter an activity type for standard value &V1& or the activity type was copied from the work ce...
Click on this link to search all SAP messages.