Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 452
Message text: No work center specified: The standard values are deleted.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CP452
- No work center specified: The standard values are deleted. ?The SAP error message CP452 ("No work center specified: The standard values are deleted") typically occurs in the context of production planning and control, particularly when dealing with routing and work centers in the SAP system. This error indicates that the system is unable to find a valid work center for the operation in question, which is necessary for calculating standard values such as time and costs.
Causes:
- Missing Work Center: The work center associated with the operation in the routing is either not specified or has been deleted.
- Deleted Standard Values: The standard values for the work center may have been deleted or not maintained properly.
- Routing Issues: The routing may not be correctly set up, leading to missing or incorrect references to work centers.
- Configuration Issues: There may be configuration issues in the production planning module that prevent the system from recognizing the work center.
Solutions:
Check Work Center Assignment:
- Go to the routing transaction (e.g., CA01, CA02) and check if the work center is correctly assigned to the operation.
- If the work center is missing, you need to assign a valid work center.
Verify Work Center Data:
- Use transaction code CR01 or CR02 to check the work center details.
- Ensure that the work center is active and has the necessary standard values maintained (e.g., available capacity, standard time, etc.).
Maintain Standard Values:
- If the standard values for the work center have been deleted, you will need to re-enter them. This can be done in the work center configuration.
- Ensure that the standard values are correctly defined for the operations you are trying to execute.
Check Routing Configuration:
- Review the routing to ensure that all operations are correctly defined and that they reference valid work centers.
- If necessary, recreate the routing or modify it to include the correct work center.
Consult Documentation:
- Refer to SAP documentation or help resources for additional guidance on work centers and routings.
System Configuration:
- If the issue persists, it may be necessary to consult with your SAP Basis or configuration team to check for any underlying configuration issues that may be affecting the work center functionality.
Related Information:
By following these steps, you should be able to resolve the CP452 error and ensure that your production planning processes function smoothly.
Get instant SAP help. Sign up for our Free Essentials Plan.
CP451
Change work center: Check standard value definitions
What causes this issue? You are attempting to change the work center in an operation. Note that the new work center may have a different standard val...
CP450
Delete work center: Standard values and activity types are deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP453
You cannot enter the standard value &
What causes this issue? You have entered a value for the standard value &V1&. However, due to the rule maintained in the work center, the st...
CP454
Enter standard value &
What causes this issue? The rule in the work center specifies that the standard value &V1& should or must be entered.How to fix this error? ...
Click on this link to search all SAP messages.