Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 209
Message text: Change number & exceeds existing change status (Number&)
During the date shift, a change status, shifted with the change number
&V1&, exceeds an existing change status with the change number &V2&.
The date shift is allowed or not according to the Customizing setting.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CP209
- Change number & exceeds existing change status (Number&) ?The SAP error message CP209 indicates that a change number you are trying to use exceeds the existing change status for a particular object. This typically occurs in the context of change management in SAP, particularly when dealing with change numbers in the context of production planning or engineering change management.
Cause: The error occurs when: You are trying to assign a change number that is higher than the current change number status for the object. The change number you are trying to use is not valid for the current state of the object. There may be a configuration issue or a misunderstanding of the change management process.
Solution: To resolve the CP209 error, you can take the following steps: Check Change Number Status: Verify the current change number status of the object you are working with. You can do this by navigating to the relevant transaction (e.g., CC01, CC02, or CC03 for change management) and checking the
Get instant SAP help. Sign up for our Free Essentials Plan.
CP208
Change number & collision with available change number &
What causes this issue? During the date shift, the change status, which is shifted with change number &V1&, collided with an existing change ...
CP207
Change number &1 exceeds the material-routing assignment change status &2
What causes this issue? During the date shift, the change status of the material-routing assignment, shifted with the change number &, exceeds an...
CP210
Change number & collsion with PRT to this operation (Change number &)
What causes this issue? During the date shift, a PRT assignment which is shifted with change number &V1&, collided with an existing change st...
CP211
Change number & exceeds PRT to this operation (change number &)
What causes this issue? During the date shift, a PRT assignment, shifted with the change number &V1&, exceeds an existing change status with ...
Click on this link to search all SAP messages.