Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 095
Message text: Change number was entered, revision level will be ignored.
You want to change or create a routing and have entered a change number
as well as a revision level.
Revision level is an additional indicator of a material change status
with respect to a certain change number. If you have entered a change
number, the system determines the <LS>valid-from</> date from the
corresponding change master record. In this case, the revision level is
ignored even if the change number and the revision level are not
related to the same material change status.
Error message extract from SAP system. Copyright SAP SE.
CP095
- Change number was entered, revision level will be ignored. ?The SAP error message CP095 ("Change number was entered, revision level will be ignored") typically occurs in the context of change management within SAP, particularly when working with change numbers and revision levels in the context of engineering change management (ECM) or similar processes.
Cause: This error message indicates that a change number has been specified in a transaction, but the system is set to ignore the revision level associated with that change number. This can happen for several reasons: Change Number and Revision Level Conflict: The system is designed to prioritize the change number over the revision level. If both are provided, the revision level is disregarded. Configuration Settings: The configuration settings in the system may dictate that when a change number is entered, the revision level should not be considered. Transaction Context: The specific transaction you are using may not support the combination of change numbers and revision levels, leading to the system
Get instant SAP help. Sign up for our Free Essentials Plan.
CP094
Enter material for production version
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP093
Not all the production versions could be checked
(change material) or MM03 (display material): Authorization object ,,Authorization field Value Material master: Plant ,,Activity &...
CP096
Key date & will be taken from the chg no. via the revision level
What causes this issue? You entered the revision level on the initial maintenance screen. The system determined the change number using the revision ...
CP097
Changes using a revision level are only possible with a material.
What causes this issue? You want to make changes referencing a revision level, yet you have not entered a material on the intitial screen. Changes to...
Click on this link to search all SAP messages.