Do you have any question about this error?
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 022
Message text: Lot size &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CP022
- Lot size & ?The SAP error message CP022 typically relates to issues with lot sizing in the context of production planning or material requirements planning (MRP). The message usually indicates that there is a problem with the lot size configuration for a particular material or production order.
Cause:
- Lot Size Configuration: The lot size for the material may not be defined correctly in the material master or in the production order.
- Missing Parameters: Required parameters for the lot size calculation may be missing or incorrectly set up in the configuration.
- Material Master Data: The material master data may not have the appropriate lot size settings, or the settings may not align with the production planning strategy.
- Production Version: If a production version is not assigned or is incorrect, it can lead to this error.
- Planning Strategy: The planning strategy used for the material may not support the lot size defined.
Solution:
- Check Material Master: Go to the material master (transaction code MM03) and verify the lot size settings under the MRP view. Ensure that the lot size is defined correctly.
- Review Lot Size Parameters: Check the lot size parameters in the configuration (transaction code OMD0) to ensure they are set up correctly.
- Adjust Production Version: If applicable, ensure that the correct production version is assigned to the material and that it has the appropriate lot size defined.
- Update Planning Strategy: If the planning strategy is causing the issue, consider updating it to one that supports the desired lot size.
- Consult Documentation: Review SAP documentation or help files related to lot sizing and production planning for additional guidance.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CP021
Plant &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP020
Funct. location &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP023
Status &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP024
Key date &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...