Message type: E = Error
Message class: CO - PPC order processing messages
Message number: 746
Message text: Project & does not allow make-to-order stock
There is no project stock for the project.
To create a production order with reference to a WBS element the
project must allow project stock to be maintained.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
You should select a project that allows project stock.
Error message extract from SAP system. Copyright SAP SE.
CO746
- Project & does not allow make-to-order stock ?The SAP error message CO746 indicates that a project does not allow make-to-order (MTO) stock. This error typically arises in the context of production planning and project management within SAP, particularly when dealing with make-to-order production scenarios.
Cause:
The error CO746 can occur due to several reasons:
Project Settings: The project may be configured in such a way that it does not allow for make-to-order stock. This could be due to the project type or specific settings in the project definition.
Material Master Settings: The material associated with the project may not be set up for make-to-order production. This includes settings in the material master that dictate how the material is produced and managed in inventory.
Order Type Configuration: The order type used for the project may not support make-to-order production. This can be a configuration issue in the SAP system.
Stock Type: The stock type for the project may not be compatible with make-to-order processes. For example, if the project is set to use stock that is not designated for MTO, this error can occur.
Solution:
To resolve the CO746 error, consider the following steps:
Check Project Settings:
- Go to the project definition in SAP and verify the settings related to make-to-order production. Ensure that the project type allows for MTO stock.
Review Material Master:
- Check the material master record for the relevant materials. Ensure that the MRP type is set to allow for make-to-order production (e.g., MRP type "P" for MTO).
Examine Order Type Configuration:
- Review the configuration of the order type used for the project. Ensure that it is set up to allow for make-to-order production.
Adjust Stock Type:
- If necessary, adjust the stock type settings to ensure compatibility with make-to-order processes.
Consult Documentation:
- Refer to SAP documentation or consult with your SAP support team for specific configuration settings related to projects and make-to-order production.
Testing:
- After making the necessary changes, test the process again to ensure that the error is resolved.
Related Information:
CJ20N
(Project Builder) to check project settings, or MM03
(Material Master Display) to review material settings.If the issue persists after following these steps, it may be beneficial to engage with your SAP support team or a consultant who specializes in SAP production planning and project management.
Get instant SAP help. Start your 7-day free trial now.
CO745
Company code & varies from that of the WBS element
What causes this issue? The company code determined for the production order does not correspond to the company code for the WBS element.System Respo...
CO744
Controlling area & varies from that of the WBS element
What causes this issue? The controlling area of the production order does not correspond to the controlling area of the WBS element.System Response ...
CO747
A purchase order with parts already exists for operation &
What causes this issue? A purchase order with parts to be provided already exists for the operation.System Response If a component that already exis...
CO748
Material &1 in sales order is not the same as material &2 in template
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.