How To Fix CO360 - The float before production cannot be reduced by more than 100 %


CO360 - Overview

  • Message type: E = Error

  • Message class: CO - PPC order processing messages

  • Message number: 360

  • Message text: The float before production cannot be reduced by more than 100 %

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CO360 - The float before production cannot be reduced by more than 100 % ?
    The SAP error message CO360, "The float before production cannot be reduced by more than 100 %," typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that the system is trying to reduce the float (the amount of time that a task can be delayed without delaying the project) for a production order or operation beyond the allowable limit.
    
    Cause: Float Calculation: The float is calculated based on the scheduled start and finish dates of operations. If the system attempts to schedule an operation in such a way that it would require reducing the float to a negative value, this error will occur. Scheduling Conflicts: There may be conflicts in the scheduling of operations, such as overlapping tasks or insufficient resources. Incorrect Configuration: The configuration settings for production scheduling may not be set correctly, leading to unrealistic scheduling attempts. Dependencies: There may be dependencies between operations that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:
  • CO359 The cost log is empty
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • CO358 Routing selected without lot size
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • CO361 Enter costing sheet
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • CO362 Overhead key & not found
    Overhead key &V1& cannot be entered in this field for one of the following reasons: The overhead key is not maintained. In this case, define ...

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker