How To Fix CO212 - Reference operations set & is not defined in plant & (check entry)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CO - PPC order processing messages

  • Message number: 212

  • Message text: Reference operations set & is not defined in plant & (check entry)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CO212 - Reference operations set & is not defined in plant & (check entry) ?

    The SAP error message CO212 indicates that a reference operation set (ROS) is not defined for a specific plant. This error typically occurs in the context of production planning and control, particularly when working with routing and operations in the SAP system.

    Cause:

    1. Missing Reference Operation Set: The reference operation set you are trying to use has not been defined in the specified plant.
    2. Incorrect Plant Assignment: The reference operation set may exist, but it is not assigned to the plant you are working with.
    3. Data Inconsistency: There may be inconsistencies in the master data, such as routing or work center definitions.

    Solution:

    1. Define the Reference Operation Set:

      • Go to the transaction code CR01 (Create Reference Operation Set) or CR02 (Change Reference Operation Set).
      • Check if the reference operation set exists for the specified plant. If it does not, you will need to create it.
    2. Assign the Reference Operation Set to the Plant:

      • If the reference operation set exists but is not assigned to the plant, you can assign it by editing the reference operation set and ensuring it is linked to the correct plant.
    3. Check Routing and Work Center:

      • Ensure that the routing and work center associated with the reference operation set are correctly defined and assigned to the plant.
      • Use transaction codes CA01 (Create Routing) or CA02 (Change Routing) to verify the routing details.
    4. Data Consistency Check:

      • Perform a consistency check on the master data to ensure that all necessary components are correctly defined and linked.
    5. Consult Documentation:

      • Review SAP documentation or help files related to reference operation sets and production planning for additional guidance.

    Related Information:

    • Transaction Codes:

      • CR01: Create Reference Operation Set
      • CR02: Change Reference Operation Set
      • CA01: Create Routing
      • CA02: Change Routing
      • CA03: Display Routing
    • Master Data: Ensure that all relevant master data (like work centers, routings, and production versions) is correctly set up in the system.

    • SAP Notes: Check for any relevant SAP Notes that may address specific issues or bugs related to reference operation sets.

    • User Authorization: Ensure that you have the necessary authorizations to create or modify reference operation sets and related master data.

    By following these steps, you should be able to resolve the CO212 error and ensure that your reference operation sets are correctly defined and assigned in the SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker