Do you have any question about this error?
Message type: E = Error
Message class: CO - PPC order processing messages
Message number: 207
Message text: No suitable alternative found for lot size & date &
No routing exists for the date and lot size you
have entered.
The system lists all routings for the material.
Select a routing.
Error message extract from SAP system. Copyright SAP SE.
CO207
- No suitable alternative found for lot size & date & ?The SAP error message CO207 "No suitable alternative found for lot size & date &" typically occurs in the context of production planning and control, particularly when dealing with production orders, material requirements planning (MRP), or when trying to create a production order for a specific lot size and date.
Cause:
- Lot Size Configuration: The system cannot find a suitable alternative for the specified lot size. This could be due to the absence of a valid production version or recipe that matches the required lot size.
- Material Availability: The required materials may not be available in the specified lot size or may not be planned for production on the specified date.
- Production Versions: There may be no production versions defined for the material that match the specified criteria (lot size, date).
- Planning Parameters: The planning parameters for the material may not be set correctly, leading to the system being unable to find a suitable alternative.
- Date Constraints: The specified date may fall outside the valid production period for the material.
Solution:
- Check Production Versions: Verify that the production versions for the material are correctly defined and include the required lot sizes. You can do this by navigating to the material master (transaction MM03) and checking the production version tab.
- Adjust Lot Size: If possible, try adjusting the lot size to one that is available in the system. This can be done in the production order or MRP settings.
- Review Material Availability: Ensure that the necessary materials are available for the specified lot size and date. You can check this using transaction MD04 (Stock/Requirements List).
- Check Planning Parameters: Review the planning parameters for the material in the material master (transaction MM02) to ensure they are set correctly.
- Change Date: If the specified date is not valid, consider changing it to a date that falls within the production period for the material.
- Consult with Production Planning Team: If you are unable to resolve the issue, consult with your production planning team or SAP support for further assistance.
Related Information:
By following these steps, you should be able to identify the root cause of the CO207 error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
CO206
Control key & is not defined for routing application &
What causes this issue? The control key you entered is not defined for task list application &V2&.How to fix this error? Check whether you h...
CO205
No routing alternative could be selected
What causes this issue? The system could not select a routing automatically.System Response The system lists all routings for the material.How to fi...
CO208
Make an entry in all required fields
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CO209
Enter reference sequence
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.