Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 747
Message text: Maximum of & days copied as duration of activity &
You want to adjust the duration of a network activity to the maximum
delivery time or replenishment lead time of all allocated material
components.
The system only calculates using the allocated material components that
have the indicator <ZH>Alignment finish date</> set. The maximum
duration comes from
the planned delivery time when the material components are procured
externally
the total replenishment lead time when the material components are
produced internally or the in-house production time if the total
replenishment lead time is not maintained in the material master
Make sure that the <ZH>Alignment finish date</> indicator on the
component detail screen of the activity is set for all material
components allocated to the activity.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message CN747 ("Maximum of & days copied as duration of activity &") typically occurs in the context of project management within SAP, particularly when dealing with network activities in Project System (PS) or when scheduling tasks. This error indicates that the duration of an activity being copied exceeds the maximum allowable limit set in the system.
Cause:
Duration Exceeds Limit: The primary cause of this error is that the duration of the activity being copied exceeds the maximum number of days allowed by the system configuration. This limit is often set to prevent excessively long durations that could complicate project scheduling and resource allocation.
Configuration Settings: The maximum duration limit can be configured in the system settings, and it may vary based on organizational policies or project requirements.
Solution:
Check Configuration Settings: Review the configuration settings for maximum activity duration in the Project System. This can typically be found in the customizing
Get instant SAP help. Sign up for our Free Essentials Plan.
CN746 Sales order item & not permitted for ind. customer stock
What causes this issue? You changed a material component allocation to a sales order item.System Response The sales order item you entered does not ...
CN745 Changes to sales order item can influence requirements planning
What causes this issue? You changed a material component allocation to a sales order item.System Response The system does not check whether planned ...
CN748 No authorization to maintain planned independent requirements
What causes this issue? You want to generate planned independent requiremens but do not have the necessary authorization.System Response The system ...
CN749 Error when generating planned independent requirements
What causes this issue? An error occurred when planned independent requirements were being generated.System Response The system does not generate th...
Click on this link to search all SAP messages.