Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 730
Message text: Enter start date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CN730
- Enter start date ?The SAP error message CN730 "Enter start date" typically occurs in the context of project management or network planning within the SAP system, particularly when working with project structures, networks, or activities. This error indicates that a required field for the start date has not been filled in, which is necessary for the system to process the data correctly.
Cause: Missing Input: The start date field is left blank when creating or modifying a project, network, or activity. Incorrect Data Entry: The date format may not be recognized by the system, leading to the error. System Configuration: There may be specific configurations or settings in the project management module that require a start date to be entered.
Solution: Enter Start Date: Navigate to the relevant screen where the error occurred and ensure that you enter a valid start date in the designated field. Check Date Format: Make sure that the date is entered in the correct format
Get instant SAP help. Sign up for our Free Essentials Plan.
CN729
Material & is incompatible with item category & (check entry)
What causes this issue? Item type &V2& does not agree with the procurement type in material master record &V1&.How can this happen? ...
CN728
Enter movement types for project management/networks
What causes this issue? The table <LS>movement types</> has not been maintained for project management in Customizing. The system needs ...
CN731
Dates copied from project definition &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN732
Dates copied from WBS element &
What causes this issue? The system copies the dates from the project definition or WBS element to the network header as follows: The system issues an...
Click on this link to search all SAP messages.