How To Fix CN711 - No material components allocated to network


CN711 - Overview

  • Message type: E = Error

  • Message class: CN - Meldungen für Netzpläne

  • Message number: 711

  • Message text: No material components allocated to network

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CN711 - No material components allocated to network ?
    The SAP error message CN711: No material components allocated to network typically occurs in the context of project systems (PS) or production planning (PP) when you are trying to perform an operation that requires material components to be allocated to a network or activity, but none have been assigned.
    
    Cause: No Material Components Assigned: The most common cause is that the network or activity you are working with does not have any material components assigned to it. Incorrect Network Type: The network type may not be set up to allow material components. Missing BOM (Bill of Materials): If the network is supposed to derive its components from a BOM, the BOM may not be correctly defined or may not exist. Incorrect Configuration: There may be configuration issues in the project system or production planning settings that prevent the allocation of materials. Status of the Network: The network might be in a status that does not allow

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker