Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 618
Message text: Cost control key not allowed for activity
You have entered a cost control key for the activity.
You cannot use a cost control key for this activity.
INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX
Enter a different control key.
Error message extract from SAP system. Copyright SAP SE.
CN618
- Cost control key not allowed for activity ?The SAP error message CN618 ("Cost control key not allowed for activity") typically occurs in the context of project management and cost controlling within SAP, particularly when dealing with internal orders or project systems. This error indicates that the cost control key assigned to an activity is not valid or not allowed for the specific context in which it is being used.
Cause:
- Invalid Cost Control Key: The cost control key assigned to the activity may not be defined correctly in the system or may not be allowed for the type of activity being processed.
- Configuration Issues: The configuration settings in the controlling area or project definition may not permit the use of the specified cost control key.
- Activity Type Restrictions: Certain activity types may have restrictions on which cost control keys can be used.
- Master Data Issues: The master data for the activity or the cost control key may be incomplete or incorrectly set up.
Solution:
- Check Cost Control Key: Verify that the cost control key assigned to the activity is valid and correctly configured in the system. You can do this by navigating to the relevant configuration settings in SAP.
- Review Activity Type Settings: Ensure that the activity type being used allows for the specified cost control key. This can be checked in the configuration settings for activity types.
- Adjust Project Definition: If the project definition or internal order does not allow the use of the cost control key, consider modifying the project settings to include the necessary permissions.
- Consult Master Data: Review the master data for both the activity and the cost control key to ensure that all required fields are filled out correctly and that there are no inconsistencies.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on configuring cost control keys and activity types.
Related Information:
CJ20N
(Project Builder), KO02
(Change Order), or KP26
(Change Activity Type Planning) to review and modify the relevant settings.If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in controlling and project systems.
Get instant SAP help. Start your 7-day free trial now.
CN617
Factory calendar not assinged for activity "&" in network "&"
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN611
Network contains loops and cannot be scheduled
What causes this issue? The network cannot be scheduled because there are relationships to activities which create a loop.System Response INCLUDE ...
CN619
Control key not available for costs
What causes this issue? You have entered a control key for a general costs activity that is not valid.System Response INCLUDE 'NA_ALLG_NOVERARB...
CN620
Maintain control key in network profile
What causes this issue? You are attempting to create an activity or activity element in a network. However, the control key in the network profile h...
Click on this link to search all SAP messages.