Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 495
Message text: Quantity in activity & element & is too large - check
When you multiply using the execution factor in activity &V1&, you get
a value for the activity quantity in activity element &V2& which is too
large.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
Enter a lower value for the execution factor for the activity.
Error message extract from SAP system. Copyright SAP SE.
CN495
- Quantity in activity & element & is too large - check ?The SAP error message CN495 indicates that the quantity specified in an activity or element is too large for the system to process. This error typically occurs in the context of project management and controlling, particularly when dealing with activities, costs, or resource allocations in SAP Project System (PS) or Controlling (CO) modules.
Cause:
- Exceeding Limits: The quantity entered for an activity or element exceeds the maximum allowable limit defined in the system settings.
- Data Entry Error: There may be a mistake in the data entry, such as an extra digit or incorrect unit of measure.
- Configuration Issues: The configuration settings for the project or activity may not be set up correctly, leading to constraints on the quantity.
- Currency Conversion Issues: If the quantity is related to costs, there may be issues with currency conversion that affect the total amount.
Solution:
- Check Quantity: Review the quantity entered for the activity or element. Ensure that it is within the acceptable range and correct any data entry errors.
- Review Configuration: Check the configuration settings for the project or activity. Ensure that the limits for quantities are set appropriately in the system.
- Adjust Limits: If necessary, consult with your SAP administrator or functional consultant to adjust the limits for quantities in the relevant configuration settings.
- Validate Units of Measure: Ensure that the units of measure used are correct and consistent with the project requirements.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on the limits and configurations for your version of SAP.
Related Information:
If the issue persists after following these steps, it may be beneficial to engage with SAP support or your internal IT team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
CN494
Quantity in activity & is too large - check
What causes this issue? When you multiply using the execution factor in activity &V1&, you get a value for the activity quantity, which is to...
CN493
Quantity of component & is too large - check
What causes this issue? When you multiply using the execution factor in the activity, you get a value for material component &V1& which is to...
CN496
Execution factor for activity & network & becoming too large - check
What causes this issue? If the system multipies the execution factor in the header of network &V2& by the execution factor in activity &...
CN497
Execution factor must be an integer multiple of the header factor (&)
What causes this issue? The execution factor in the activity must be an integer multiple of the execution factor in the network header (&V1&)...