Do you have any question about this error?
Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 348
Message text: Function is only possible for external activities/activity elements
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CN348
- Function is only possible for external activities/activity elements ?The SAP error message CN348 ("Function is only possible for external activities/activity elements") typically occurs in the context of project management within SAP, particularly when dealing with network activities in Project System (PS) or when trying to perform certain operations on activities that are not defined as external.
Cause:
This error usually arises when you attempt to perform an operation (like assigning costs, changing status, or executing a function) on an internal activity or a standard activity element that is not classified as an external activity. External activities are those that involve external resources or costs, while internal activities are usually related to internal resources or costs.
Solution:
To resolve this error, consider the following steps:
Check Activity Type: Ensure that the activity you are trying to work with is indeed an external activity. You can do this by checking the activity type in the project definition.
Change Activity Type: If the activity is not external and should be, you may need to change its type to an external activity. This can typically be done in the project definition or activity details.
Review Project Structure: Ensure that the project structure is set up correctly. Sometimes, the hierarchy or the way activities are linked can cause issues.
Use Correct Functions: Make sure you are using the correct functions for the type of activity you are working with. Some functions are only applicable to external activities.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the functions you are trying to use and their applicability to different activity types.
Check Authorizations: Ensure that you have the necessary authorizations to perform the action on the activity.
Contact Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
By following these steps, you should be able to identify the cause of the CN348 error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
CN347
Plant &1 is not assigned to the project controlling area &2
What causes this issue? Plant &V1& is not assigned to the same controlling area (&V2&) as the project. INCLUDE 'NA_ALLG_ORGELEM&...
CN346
The event is not assigned a position in any group
What causes this issue? You want to schedule events according to their position in the sequence and relative offset. However, the event that you sele...
CN349
Supply source determination carried out for &1 / &2
What causes this issue? You added a component to be externally procured.System Response Due to the parameterization of component data the system car...
CN350
You cannot change the activity type
What causes this issue? You want to replace an activity with a subnetwork. In Customizing the activity has been given a particular control key, that ...