Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 317
Message text: There is not a WBS BOM for the material and plant
No WBS BOM exists for this combination of material and plant.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
To create a WBS BOM choose <zh> Logistics -> Production -> Bills of
Material -> Bill of Material -> WBS BOM</>.
Error message extract from SAP system. Copyright SAP SE.
CN317
- There is not a WBS BOM for the material and plant ?The SAP error message CN317 indicates that there is no Bill of Materials (BOM) associated with a Work Breakdown Structure (WBS) element for the specified material and plant. This error typically occurs in the context of project management and production planning when trying to create or process a project-related order that requires a BOM.
Cause:
- Missing BOM: The primary cause of this error is that a BOM has not been created for the specified material in the context of the WBS element.
- Incorrect Material or Plant: The material or plant specified may not have a BOM defined, or the BOM may not be assigned to the correct WBS element.
- BOM Status: The BOM might be inactive or not released for use.
- WBS Element Configuration: The WBS element may not be properly configured to link to the BOM.
Solution:
Create a BOM: If a BOM does not exist for the material and plant, you need to create one. This can be done using transaction code
CS01
(Create BOM).
- Ensure that the BOM is created for the correct material and plant.
- Assign the BOM to the appropriate WBS element if necessary.
Check BOM Assignment: If a BOM exists, verify that it is correctly assigned to the WBS element. You can check this using transaction code
CS03
(Display BOM) to see if the BOM is linked to the correct WBS.Activate/Release BOM: If the BOM exists but is inactive, you may need to activate or release it. This can be done in the BOM management screen.
Verify Material and Plant: Double-check that the material and plant you are using in your transaction are correct and that they correspond to the BOM you are trying to use.
Check WBS Configuration: Ensure that the WBS element is properly configured to use BOMs. This may involve checking the project structure and settings.
Related Information:
Transaction Codes:
CS01
: Create BOMCS02
: Change BOMCS03
: Display BOMCJ20N
: Project Builder (to manage WBS elements)BOM Types: Understand the different types of BOMs (e.g., material BOM, WBS BOM) and ensure you are using the correct type for your project.
Documentation: Refer to SAP documentation or help files for detailed steps on creating and managing BOMs and WBS elements.
User Authorizations: Ensure that you have the necessary authorizations to create or modify BOMs and WBS elements in SAP.
By following these steps, you should be able to resolve the CN317 error and successfully link the BOM to the WBS element for your project.
Get instant SAP help. Start your 7-day free trial now.
CN316
Activity/element &1 &2 could not be created
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN315
Enter a scheduling type without the "Time of day" indicator
What causes this issue? You have chosen a scheduling type for which the <zh>Basic dates with time of day</> indicator has been set in Cus...
CN318
External network number & cannot be used more than once
What causes this issue? You were trying to create several networks with the same external number &V1&.System Response The system issues an e...
CN319
Activity &1 has been assigned material components - Deletion not allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.