Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 270
Message text: The component has not been allocated to valuated individual stock
Unit costing is only possible for material components that have been
allocated to valuated individual stocks.
Error message extract from SAP system. Copyright SAP SE.
CN270
- The component has not been allocated to valuated individual stock ?The SAP error message CN270 indicates that a component has not been allocated to valuated individual stock. This typically occurs in the context of production orders or when dealing with stock management in SAP, particularly in the areas of materials management (MM) and production planning (PP).
Cause: Component Not Assigned: The component in question has not been assigned to a valuated stock type. This can happen if the material is not set up correctly in the system. Stock Type Issues: The stock type of the component may not be set to "valuated" in the material master record. Incorrect Configuration: The configuration settings in the system may not allow for the allocation of the component to the required stock type. Missing Stock: There may not be any available stock of the component in the required stock type. Document Type Restrictions: The document type being used may not allow for the allocation of the component to valuated stock.
Solution: Check
Get instant SAP help. Sign up for our Free Essentials Plan.
CN269
WBS element & does not have valuated stock
What causes this issue? You want to change the assignment of a component to a WBS element. However, as opposed to the original WBS element, the WBS e...
CN268
Planned independent requirements not found for &1 on &2
What causes this issue? You have changed the requirements date for a planned independent requirement for material &v1&.System Response The s...
CN271
Component allocations to individual stock still exist
What causes this issue? You want to delete the assignment of a network header or an activity to a WBS element or a sales order item. However ther are...
CN272
Controlling area &1 of the plant is different to that of the network (&2)
What causes this issue? You want to explode a material BOM and allocate BOM items to a network activity. The plant for the BOM is assigned to control...