Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 267
Message text: Network & has been unlocked
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CN267
- Network & has been unlocked ?The SAP error message CN267 ("Network & has been unlocked") typically occurs in the context of project management and network planning within the SAP system, particularly in the Project System (PS) module. This message indicates that a network has been unlocked, which may affect the ability to perform certain operations on that network.
Cause:
- Network Status: The network in question may have been previously locked for changes (e.g., due to ongoing operations or approvals) and has now been unlocked, which can lead to confusion if users are not aware of the status change.
- User Actions: A user may have attempted to perform an operation (like changing or deleting a network) that is not allowed when the network is in a locked state.
- System Configuration: The system may be configured to automatically unlock networks after certain conditions are met, which can lead to this message being displayed.
Solution:
- Check Network Status: Verify the current status of the network in question. You can do this by navigating to the network in the Project System and checking its status.
- Review User Permissions: Ensure that the user has the necessary permissions to make changes to the network. If the user does not have the required authorization, they may need to contact their SAP administrator.
- Re-lock the Network: If the network should remain locked for certain operations, consider re-locking it after the necessary changes have been made.
- Consult Documentation: Review SAP documentation or help resources for specific instructions related to the network and project management processes.
- Contact Support: If the issue persists or if there are specific configurations in your SAP environment that are causing this message, consider reaching out to your SAP support team for further assistance.
Related Information:
By following these steps, you should be able to address the CN267 error message effectively.
Get instant SAP help. Start your 7-day free trial now.
CN266
Network & is locked
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN265
Activity element &1 does not exist in network &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN268
Planned independent requirements not found for &1 on &2
What causes this issue? You have changed the requirements date for a planned independent requirement for material &v1&.System Response The s...
CN269
WBS element & does not have valuated stock
What causes this issue? You want to change the assignment of a component to a WBS element. However, as opposed to the original WBS element, the WBS e...