How To Fix CN242 - For network &1 all 9999 operation numbers have already been assigned


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CN - Meldungen für Netzpläne

  • Message number: 242

  • Message text: For network &1 all 9999 operation numbers have already been assigned

  • Show details Hide details
  • What causes this issue?

    All the activity number from 0001 to 9999 have been used in network
    &v1&.

    System Response

    It is not possible to create any more activities for this network.
    Processing is not continued.

    How to fix this error?

    Create a new network for further activities

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CN242 - For network &1 all 9999 operation numbers have already been assigned ?

    The SAP error message CN242 indicates that for a specific network (identified by &1), all 9999 operation numbers have already been assigned. This typically occurs in the context of project management and network planning within SAP's Project System (PS) module.

    Cause:

    1. Exceeding Operation Limits: Each network in SAP can have a maximum of 9999 operations. If you try to add more operations than this limit, you will encounter this error.
    2. Network Configuration: The network might have been configured in such a way that it has already utilized all available operation numbers.
    3. Data Migration or Import Issues: If data was imported or migrated into the system, it might have inadvertently filled up the operation numbers.

    Solution:

    1. Review Existing Operations: Check the existing operations in the network to see if there are any that can be deleted or consolidated. This can free up operation numbers.
    2. Split the Network: If the network is too large, consider splitting it into multiple networks. This will allow you to create new operations in the new networks without hitting the limit.
    3. Re-evaluate Project Structure: Assess the project structure to see if it can be optimized. Sometimes, restructuring can help in managing operations more effectively.
    4. Use Subnetworks: If applicable, consider using subnetworks to manage operations more efficiently.
    5. Consult SAP Documentation: Review SAP documentation or consult with your SAP support team for any specific configurations or settings that might help in your scenario.

    Related Information:

    • Transaction Codes: You can use transaction codes like CN21 (Create Network) or CN22 (Change Network) to manage networks and operations.
    • SAP Notes: Check for any relevant SAP Notes that might address this issue or provide additional guidance.
    • Performance Considerations: Be aware that having a large number of operations in a single network can impact system performance, so it's generally advisable to keep networks manageable.

    If the problem persists after trying the above solutions, it may be beneficial to reach out to your SAP support team for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant