How To Fix CN178 - WBS element is already marked for requirements grouping


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CN - Meldungen für Netzpläne

  • Message number: 178

  • Message text: WBS element is already marked for requirements grouping

  • Show details Hide details
  • What causes this issue?

    You want to define a WBS element as a component WBS element.

    System Response

    This WBS element has already been defined for use in grouping
    requirements and therefore cannot be defined as a component WBS
    element.

    How to fix this error?

    Check your entry, and if necessary select another WBS element.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CN178 - WBS element is already marked for requirements grouping ?

    The SAP error message CN178 indicates that a Work Breakdown Structure (WBS) element is already marked for requirements grouping. This typically occurs when you attempt to perform an action on a WBS element that has already been designated for requirements grouping, which is a process used in project management to consolidate and manage requirements for a project.

    Cause:

    1. Duplicate Marking: The WBS element has already been marked for requirements grouping, and the system does not allow it to be marked again.
    2. System Configuration: The system may be configured to prevent multiple requirements grouping for the same WBS element to maintain data integrity.
    3. User Action: A user may have inadvertently tried to mark the same WBS element multiple times.

    Solution:

    1. Check Current Status: Verify the current status of the WBS element to see if it is indeed marked for requirements grouping. You can do this by navigating to the WBS element in the project structure and checking its attributes.
    2. Remove Existing Marking: If you need to change the requirements grouping for the WBS element, you may need to first remove the existing marking. This can typically be done through the project management transaction (e.g., CJ20N) or by using the appropriate function to unmark the requirements grouping.
    3. Consult Documentation: Review the SAP documentation or help files related to project management and requirements grouping for specific instructions on how to manage WBS elements.
    4. Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert who can provide guidance based on your specific system configuration.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder) or CJ02 (Change WBS Element) to manage WBS elements effectively.
    • SAP Notes: Check for any SAP Notes related to error CN178 for additional insights or patches that may address the issue.
    • User Roles: Ensure that you have the appropriate permissions to modify WBS elements and their requirements grouping status.
    • Training: Consider training sessions or resources on SAP Project System (PS) to better understand how to manage WBS elements and requirements grouping.

    By following these steps, you should be able to address the CN178 error and manage your WBS elements effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker